Project Highlights

  • Habitat Assessment/ Vernal Pools
  • Biological Resources Technical Report/Resource Avoidance Report
  • Aquatic Resource Assessment
  • Extensive Site and Resource Mapping

Artemis Environmental, in partnership with Potomac-Hudson Engineering, Inc., performed biological services to support a Site-Specific Environmental Assessment in compliance with NEPA for the Miramar National Cemetery Phase 2 Expansion at Marine Corps Air Station (MCAS) Miramar in San Diego. Artemis Environmental biologists Jasmine Bakker and Tara Baxter conducted a general habitat and resource assessment to document existing site conditions that may have changed since prior environmental review was performed, to identify vegetation/habitat communities, and to identify suitable habitat for sensitive species. Services also included a literature review, wetland and vernal pool assessment, and preparation of a Wetland Assessment Report, Resource Avoidance Report, and Biological Resources Technical Report. The reports summarize the protected biological and aquatic resources identified during the habitat and resource assessment and identifies recommendations for additional surveys and/or avoidance and minimization measures.